Where equipment lists hide the differences that will affect you for ten years. Complete the critical section before quotes arrive, not while you are reading them.

Print it, or fill it in here. Nothing you type is sent anywhere.

Critical — define these first

Nothing else can be scoped, quoted or compared until these are answered.

Facilities manager and school staff member reviewing AV proposals and floor plans at a table beside the school hall
The cheapest quote is usually the one that has left something out. The question is what.

Conditional — define if these apply

Work through each trigger. If it applies to your site, the item becomes critical.

Optional — worth defining

Not required, but each one makes the next conversation shorter.

Traps to avoid in comparing AV quotes

Comparing quotes by equipment list rather than reliability, usability and support.

Treating AV integration as a hardware purchase rather than a usability and support decision.

Discovering an obligation after the quote has been accepted.

Buying hardware without a support pathway, then discovering the supplier has moved on.

Treating hearing augmentation as an add-on rather than part of the design.

What happens next

1Anything left blank in the critical section is a gap, not an oversight. It will surface later, usually during installation.

2Bring the completed sheet to a site review. It replaces about half the meeting.

3If a conditional trigger applies and you are unsure how to answer it, that is exactly what the review is for.

Answers save automatically in this browser10 critical items still undefined