Skip to content
Clearasound AV — Hear · See · ConnectBook a review
0 of 21 defined
Checklist

School hall AV upgrade checklist

The decisions that matter most for assemblies, performances and visiting speakers. Settle these before a specification is written, not after a quote is accepted.

Print it, or fill it in here. Nothing you type is sent anywhere.

Critical — define these first

Nothing else can be scoped, quoted or compared until these are answered.

School hall from the operator position — digital mixing console and laptop in the foreground, stage lighting and speakers beyond
A hall that works for assembly on Monday and a production on Friday is two specifications, not one.

Conditional — define if these apply

Work through each trigger. If it applies to your site, the item becomes critical.

Optional — worth defining

Not required, but each one makes the next conversation shorter.

Traps to avoid in school hall AV projects

Designing a hall system only a technician can operate, then rostering relief staff to run assembly.

Specifying hearing augmentation without checking which devices your students actually use.

Treating soundfield amplification as though it satisfies hearing augmentation obligations.

Assuming installed means compliant. Verification, signage and staff training are separate steps.

Adding paging, alerts or access control without involving ICT and facilities early.

What happens next

1Anything left blank in the critical section is a gap, not an oversight. It will surface later, usually during installation.

2Bring the completed sheet to a site review. It replaces about half the meeting.

3If a conditional trigger applies and you are unsure how to answer it, that is exactly what the review is for.

Answers save automatically in this browser8 critical items still undefined
Request a School Hall AV Review

This checklist is general guidance. Requirements vary by project, jurisdiction, building classification and approval pathway.